This scheme is based on Modbus RTU Implemented under the agreement 1 Wireless communication form of master-slave ad hoc network , The main station is S7-1200 PLC,DTD433F As a slave station .DTD433F It has the function of inputting and outputting analog signals , The direction of signal transmission is determined by the functions realized by the master-slave equipment of the user's original system . Wireless analog signal measurement and control terminal is adopted in the scheme DTD433F European and American Department PLC Wireless communication terminal DTD434MC, As a hardware device to realize wireless communication .
One 、 Program Overview
wireless Modbus Network composition
Two 、 Test equipment and parameters
1. Hardware environment construction :
● master device : Siemens S7-1200
● Slave devices :DTD433FC *4 platform
● Wireless data terminal ( master device )DTD434MC*1 block
2. Test parameters :
● Communication protocol :Modbus RTU agreement
● Master-slave relationship :1 Lord 4 from
● Master station communication interface :Rs485 Interface
● Slave interface : analog signal (AI/AO)
● Power supply :9-24VDC
● transmission distance :100 rice ,500 rice ,1KM,3KM,20KM
wireless Modbus Analog measurement and control terminal DTD433F Provide analog signal input and output interfaces , accord with MODBUS RTU agreement , It can be used as a slave , Acquisition sensors 、PLC、DCS、 Data of intelligent instruments and other equipment , And master station PC、PLC、 Configuration software 、 Touch screen 、 The man-machine interface constitutes the wireless ad hoc network communication system .
■ Lord want , sign :
◆ Analog input :1-8 passageway AI Input ,0~5V Voltage signal or 4~20mA Current signal input ;
◆ Analog output :1-8 passageway AO Output ,4~20mA Current signal output ;
◆ It can directly replace wired transmitter , Realize wireless sensor cluster networking ;
◆ transport : All digital wireless encrypted transmission ;
◆ Support standard serial port protocol : Datai free serial port agreement 、MODBUS RTU agreement
◆ DC wide voltage 9~24VDC Power supply , The average operating current is less than 50mA
Four 、 Device configuration
1. New project , And add 1 Group devices
2. Open the project to configure the equipment
3. choice CPU:CPU 1211C AC/DC/Rly Under the 6ES7 211-1BE40-0XB0
4. Add communication module
Under communication module, select Point to point —— Re selection CM1241(RS422/485)—— The final choice 6ES7 241-1CH32-0XB0 model
5. Check the device configuration and set parameters
As shown in the figure below , Set parameters as needed , We use default values here
6. Add a new block under the program block
choice DB( Data blocks ), And automatically generate background data
7. Add data group
In the new data block DB1 Add data groups as shown in the figure below
8. Master station configuration
The program programming is shown in the figure below
After completion , Load master PLC You can talk to the slave station DTD433FC Conduct wireless Modbus Communications .
5、 ... and 、 Test instructions
View relevant data through the monitoring and enforcement table
边栏推荐
- 2022 Shandong Health Exhibition, health industry exhibition, DJK China Health Expo, sleep health exhibition
- ECCV 2022 | the role of shape, texture and color in visual recognition
- 2022/07/21---滑动窗口的最大值;
- Data types and variables
- JVM parent delegation mechanism
- B-end product manager learning: data analysis - Zhuge IO, Shence data
- Félicitations pour la tenue réussie du Forum sur la gestion de l'innovation de produits « innovation et autonomisation » le 16 juillet
- El input lose focus event
- 解决Google CoLab使用外部文件的问题
- Clickhouse engine -materializemysql
猜你喜欢
采购管控: 缩短采购周期,从源头上降本增效
AM5SE-IS防孤岛保护装置如何解决分布式光伏发电过程中的影响?
SQL statement. After grouping, the group is sorted according to the datetime field, the latest record in the group is retained, and other items are deleted. (used to eliminate duplicate data within th
How to select the type of ankerui intelligent miniature circuit breaker?
ARM+SD2405 IIC_RTC驱动编写及IIC通讯协议
3A通过PMP考试有多大比例?
边框动态效果实现
工厂控制室西门子PLC如何集中无线采集多条产线生产数据?
js中splice方法的使用
(iccv-2021) transfeid: Target Recognition Based on transformer
随机推荐
小程序项目总结
ACL-IJCAI-SIGIR頂級會議論文報告會(AIS 2022)筆記1:推薦系統
:class在项目中的使用
2022.07.20
Qt中的坐标系统
B-end product manager learning: data analysis - Zhuge IO, Shence data
同一个浏览器不同窗口登录不同账号,窗口切换时,页面刷新账号变更为最后一次登录的账号
el-pinut number取消数字操作符号
v7底部栏fragment
Explore the implementation of hash table through redis source code
"Xiaodeng in operation and maintenance" ensures gdpr compliance by auditing user activities and internal changes in the ad domain
Félicitations pour la tenue réussie du Forum sur la gestion de l'innovation de produits « innovation et autonomisation » le 16 juillet
下载图片功能,全屏功能,复制功能
The difference between EM and REM
3A what is the percentage of passing the PMP Exam?
mapMutations在项目中的使用
Force deduction solution summary 814 binary tree pruning
Typescript - syntax introduction
Use of watch in projects
Multiple backpack notes